01 / Know the place
Record the site history, slope, drainage, sunlight, soil texture, compaction, utilities, access, and nearby habitat. Get permission and locate underground utilities before excavation.
A practical field guide, not a recipe
A Miyawaki-inspired project notebook for organizers: learn the design questions, shape a first site plan, and see what still needs local expertise.
Use these prompts to assemble a responsible project brief. Species, spacing, soil amendments, permits, and water needs must be selected for the actual site with qualified local guidance.
Record the site history, slope, drainage, sunlight, soil texture, compaction, utilities, access, and nearby habitat. Get permission and locate underground utilities before excavation.
Identify the locally appropriate native plant community for this soil and landform. A nearby park is not automatically the right reference. Consult an ecologist, native-plant specialist, or regional conservation group.
Document candidate canopy, sub-canopy, shrub, and ground-layer species, their provenance, mature size, water needs, and availability. Do not treat a generic species list as a Central Texas prescription.
Published Miyawaki-style projects use dense planting, but exact spacing depends on species, stock, site, climate, and care. Ask the project ecologist for a written spacing rationale before estimating stock.
Use a soil test and document how the proposed preparation addresses compaction, drainage, contamination risk, and organic matter. Avoid blanket amendment recipes; they can be wrong for the site.
Budget beyond planting day: watering, mulch replenishment, invasive control, replacement plants, volunteer coordination, accessibility, and monitoring. Assign an owner for each task and season.
Name the landowner, project lead, watering team, escalation contact, and long-term maintenance partner. Record access rights and what happens if the original organizer leaves.
Choose repeatable measures such as survival by species, canopy cover, volunteer hours, and maintenance effort. Publish the baseline, method, and follow-up dates; do not promise biodiversity or carbon outcomes in advance.
Enter project assumptions. The calculator reports arithmetic only; it does not choose a planting design.
Unofficial educational project. This is not a forestry prescription, ecological assessment, permitting guide, or promise of forest outcomes.